Page 1
2022 XI 24 0230 Seat No.
Time : 1 Hour FIRST-TERM CONSTRUCTION
(NSQF)
Subject Code
S 1 0 8 0
Total No. of Questions : 20 (Printed Pages : 8) Maximum Marks : 20
INSTRUCTIONS : (i) All questions are compulsory.
(ii) Every question has four choices for its answers (A), (B),
(C) and (D) and only one of them is the correct answer.
(iii) On the OMR sheet, for each question number darken
with a ball point pen ONLY ONE bubble corresponding
to what you consider to be the most appropriate answer
from among the four choices.
(iv) Please note that it is not possible to change the answer
once you have filled up the bubble with a ball point
pen. Hence the sufficient care must be taken while
darkening the bubbles.
(v) For each question, you will be awarded ONE mark if
you have darkened only the bubble corresponding to
the correct answer. In all other cases, you will get zero
mark.
(vi) There is no negative marking.
(vii) Only one OMR sheet will be provided.
(viii) Use only Black or Blue ball point pen.
S-1080 [FT] 1 P.T.O.
Page 2
Choose and write the correct alternative from the options given below :
1. The inability to communicate using a language is known as .............
barrier. 1
(A) Physical
(B) Linguistic
(C) Emotional
(D) Technological
2. Which of the following sentences is capitalised properly ? 1
(A) She is coming today
(B) she is Coming today
(C) She is coming Today
(D) she is coming today
3. .......................... makes you to complete work or studies without others
cheering you. 1
(A) Communication
(B) Self-motivation
(C) Self-esteem
(D) Self-regulation
S-1080 [FT] 2
Page 3
4. Stress cannot be ........................ but ......................... 1
(A) cured, practised
(B) eradicated, managed
(C) learnt, forgotten
(D) avoided, welcomed
5. ICT stands for .................................... 1
(A) Information and Communication Technology
(B) Information and Communication Terminology
(C) Information and Common Technology
(D) Information to Communication Technology
6. How can an antivirus protect your device ? 1
(A) It can protect it from overheating
(B) It can decrease its performance
(C) It can backup data
(D) It can prevent data from getting corrupt
7. The double scaffolding is called as .............................. scaffolding. 1
(A) Single frame
(B) Brick layer
(C) Masons
(D) Brick level
S-1080 [FT] 3 P.T.O.
Page 4
8. A device used for locking together the tubes in scaffolding is
called ...................................... 1
(A) Standard
(B) Ledger
(C) Base plate
(D) Coupler
9. Which scaffold is suitable if proper hard ground is not available for
standard to rest ? 1
(A) Single scaffold
(B) Cantilever scaffold
(C) Double scaffold
(D) Mobile tower scaffold
10. A temporary rigid structure having platforms raised up as the
building increases in height is called ................................. 1
(A) Scaffolding
(B) Underpinning
(C) Shoring
(D) Jacking
S-1080 [FT] 4
Page 5
11. ............................. are the vertical members of the scaffolding framework
and they are either supported on the ground or embedded into the
ground. 1
(A) Putlog
(B) Rakers
(C) Standard
(D) Ledger
12. ......................... is a board placed parallel to the ledgers and supported
between the putlogs. 1
(A) Guard rail
(B) Bolts
(C) Raker
(D) Toe board
13. In scaffolding ............................. is used to extend the width of working. 1
(A) Bracket
(B) Putlog
(C) Coupler
(D) Battern
S-1080 [FT] 5 P.T.O.
Page 6
14. ....................... is a device used to dress the cut bricks and for cutting
soft bricks. 1
(A) Raking needle
(B) Spade
(C) Scutch
(D) Pointing tool
15. Tool used to scratch the surface of partially set plaster in the
undercoat to provide a key for the following coat is ........................ 1
(A) Bolster
(B) Raking needle
(C) Pointing tool
(D) Scratcher
16. The tool used for laying the mortar as well as to obtain the desired
surface finish is .................................... 1
(A) Hacking tool
(B) Metal float
(C) Crowbar
(D) Bolster
S-1080 [FT] 6
Page 7
17. Identify the following tool used in the construction of masonry. 1
(A) Pointing tool
(B) Bolster
(C) Crowbar
(D) Scratcher
18. Identify the following tool used in the construction of masonry. 1
(A) Line and pins
(B) Trowel
(C) Mortar pan
(D) Float
19. Identify the following tool used in the construction of masonry. 1
(A) Crowbar
(B) Pick axe
(C) Scratcher
(D) Bolster
20. Identify the following tool used in the contruction of masonry. 1
(A) Pointing tool
(B) Float
(C) Tacha
(D) Measuring tape
S-1080 [FT] 7 P.T.O.